S No | Name of STP | Designed Capacity in MLD | Present Average Flow in 2018 in MLD | Length of Network laid (Km) as per DPR | Actual Length of Network laid (Km).up to date | No.of connections sanctioned | Name of Ward connected in STPs |
1
|
Dhalli
|
0.76
|
0.76
|
12.6
|
18.55
|
869
|
20,21
|
2
|
Lalpani
|
19.35
|
6.5
|
63.4
|
112.5
|
9169
|
8,9,10,11,12,13,14, 15,16,17,26,27,28, 29,30,31,32,33,34
|
3
|
North Disposal
|
5.8
|
2.5
|
35.8
|
55
|
1775
|
1,2,3,4,5
|
4
|
Sanjauli Malyana
|
4.44
|
2.5
|
40.8
|
68.5
|
3050
|
17,18,19,21,24,25,27,28
|
5
|
Snowdon
|
1.35
|
0.28
|
10.7
|
14.5
|
275
|
1,16
|
6
|
Summer Hill
|
3.93
|
0.22
|
15.7
|
18.7
|
216
|
5,6,8
|
| Total | 35.63 | 12.76 | 179.00 | 287.75 | 15354 | |