Sr. No. Name of STP Designed Capacity in MLD Present Average Flow in 2018 in MLD Length of Network laid (Km) as per DPR Actual Length of Network laid (Km).up to date No.of connections sanctioned Name of Ward connected in STPs 1. Lalpani 19.35 6.50 63.40 112.50 9169 8,9,10,11,12,13,14, 15,16,17,26,27,28, 29,30,31,32,33,34 2. Summer Hill 3.93 0.22 15.70 18.70 216 5,6,8 3. Snowdon 1.35 0.28 10.70 14.50 275 1,16 4. North Disposal 5.80 2.50 35.80 55.00 1775 1,2,3,4,5 5. Sanjauli Malyana 4.44 2.50 40.80 68.50 3050 17,18,19,21,24,25, 27,28 6. Dhalli 0.76 0.76 12.60 18.55 869 20,21 Total 35.63 12.76 179.00 287.75 15354 The STP outlet parameters as prescribed by Pcb are as follows: PH 5.5-9.00 TSS 100mg/l TDS 2100mg/l BOD 30mg/l COD 250mg/l Oil& Grease 10mg/l